Weekly timesheet generator — hours, overtime and gross pay

Enter the hours worked each day, an hourly rate, the weekly hours after which overtime starts and the overtime multiplier, and the timesheet totals the week, splits regular and overtime hours and shows gross pay, ready to sign and print.

Live demo · real result from this tool
Document
Parties

Employer / client

Employee / contractor

Hours
Totals
Notes
Gross pay$1,424.00
Total hours
43 h
Regular hours
40 h
Overtime hours
3 h

Download PDF uses a standard font (Latin characters). For other scripts use Print / Save as PDF.

Harbor Logistics LLC

Long Beach, CA

Timesheet

Timesheet no.TS-41
Week starting28 Sep 2026
ProjectWarehouse fit-out

Employee / contractor

Sam Ortiz
Contractor

Hours

#DateWork doneHours
128 Sep 2026Racking assembly9
229 Sep 2026Racking assembly9
330 Sep 2026Electrical prep8.5
41 Oct 2026Electrical prep9
52 Oct 2026Clean-up and handover7.5
Amount in words: One thousand four hundred and twenty-four dollars only
Total hours43 h
Regular hours40 h
Overtime hours (× 1.5)3 h
Regular pay @ $32.00/h1,280.00
Overtime pay @ $48.00/h144.00
Gross pay (USD)1,424.00
Employee
Approved by

Processed on your device — nothing is uploaded.

How to use the timesheet generator

  1. Under Document, add a Timesheet no., the Week starting date and the Project.
  2. Under Parties, fill in Employer / client and Employee / contractor.
  3. In Hours, add one line per day with the Date, Work done and Hours. Use + Add day for more.
  4. Under Totals, set the Hourly rate, Overtime after (hours per week) and Overtime multiplier.
  5. Check the totals, then print the sheet for signatures or download it as PDF or CSV.

What it does and when to use it

A timesheet is the record behind a pay packet or a contractor’s bill. This one turns a week of daily entries into the four numbers people argue about — total hours, regular hours, overtime hours and gross pay — and shows how each was reached, so the worker and the approver can check it in a minute.

Use it for hourly staff, part-timers, freelancers billing by the hour, or a contractor on a fixed weekly rate who is paid extra for long weeks. The printed sheet ends with Employee and Approved by signature lines.

For a full pay record with deductions, use the payslip generator. Travel and other costs claimed during the same week belong on an expense report, not on the timesheet.

How it works

Each Hours entry is turned into whole minutes, then:

  • Total hours = sum of all entries
  • Regular hours = the smaller of total hours and the overtime threshold
  • Overtime hours = total hours − threshold, if positive
  • Regular pay = regular hours × hourly rate
  • Overtime pay = overtime hours × hourly rate × multiplier
  • Gross pay = regular pay + overtime pay, with gross pay also written in words

Pay is rounded to the cent. If the hourly rate is 0, the sheet shows hours only. Everything is calculated in your browser.

Worked examples

The sample week. Days of 9, 9, 8.5, 9 and 7.5 hours make 43 hours. With a $32 rate, a 40-hour threshold and 1.5×: 40 × $32 = $1,280.00 regular, 3 × $48 = $144.00 overtime, so Overtime hours: 3 h and Gross pay: $1,424.00.

A 37.5-hour week in pounds. Same hours, rate £25, overtime after 37.5 hours at 1.5×. Regular pay 37.5 × £25 = £937.50; overtime 5.5 × £37.50 = £206.25; Gross pay: £1,143.75.

Limits and tips

  • Breaks are not subtracted. Enter hours actually worked.
  • Night, weekend or holiday premiums are not built in; add a separate line note or adjust the rate.
  • Fill the sheet daily rather than from memory at the end of the week.

Frequently asked questions

How do I type half hours?
Any of 7.5, 7:30 or 7h30 works and all mean seven and a half hours. If a cell cannot be read, the timesheet shows a warning and counts that day as zero.
Is overtime worked out per day or per week?
Per sheet. All hours on the sheet are added up, and everything above "Overtime after (hours per week)" counts as overtime. Use one sheet per week. If your contract pays daily overtime, the tool will not split it that way.
Which overtime threshold and multiplier should I use?
The ones in your contract or the rules where you work — they differ between countries, states and employers. The sample uses 40 hours and 1.5×, but the tool does not check any law. Set the threshold very high if no overtime applies.
Is gross pay what the worker takes home?
No. Gross pay is before tax and other deductions. For an employee, the employer's payroll then makes the deductions and issues a payslip.
Can contractors use it to bill a client?
Yes. Put the client under "Employer / client" and yourself under "Employee / contractor", get the sheet approved, then bill the gross figure on an invoice.

Written by the ToolsRift team · Last updated

Pages are drafted with AI assistance and checked by automated tests. How we write and check pages.

Was this tool useful?

Report a problem

Start typing to search every tool.

↑ ↓ to moveEnter to openEsc to close